East Dallas Residential Development (City of Dallas)

These projects consist of multi-family (Condos) or single family (Townhomes) residential developments in the heart of the current development surge in East Dallas. Services provided include grading, drainage, and paving design as well as coordination with the City of Dallas’ Sustainable Development and Construction (SD&C) department, and also utility plans as required by and coordinated with Dallas Water Utilities (DWU).

 

Post Oak Wastewater Treatment Plant 80 MGD Headworks Lift Station and Electrical Upgrade (City of Sherman)

The soon to be upgraded headworks lift station at the Post Oak wastewater treatment plant in the City of Sherman consists of eight new large submersible pumps and wet well capable of transferring 80 MGD of raw sewage to several units in the wastewater treatment plant through new force mains that range from 24-inch to 36-in pressure piping.

Status: Under Construction

Cost: $7,000,000

Caregory: Wastewater Treatment