The soon to be upgraded headworks lift station at the Post Oak wastewater treatment plant in the City of Sherman consists of eight new large submersible pumps and wet well capable of transferring 80 MGD of raw sewage to several units in the wastewater treatment plant through new force mains that range from 24-inch to 36-in pressure piping.
Status: Under Construction
Cost: $7,000,000
Caregory: Wastewater Treatment