Barnes Bridge Pump Station (City of Mesquite)

A 22 MGD maximum day pump station replacement that will pump treated water to the city of Mesquite from the NTMWD system.  The project includes a pump station building with 4 – 400 HP vertical turbine pumps, space for two additional 400 HP vertical turbine pumps, a generator building with 1000 kW generator set, and a water quality building.  The facility is located in the city of Dallas which required submittals to Dallas.  The construction cost was $6,000,000 and was completed in 2012.

Status: Construction Completed

Cost: $6,000,000

Caregory: Water Distribution